SPECIALIZATION
Installation:
- solar pile driving with GAYK machines
- ground screws tightening
- sub-construction and modules assembly
- wiring services DC + AC
- all ground works including cable trenching and backfill
- fencing
Pull out testing:
- ground testing service
- electrical testing
Realization project and preparation of PV
Supply of materials
We do also pull out tests. Vertical and horizontal pull tests are typically done on large megawatt sized systems prior to the main project starting.
Professional technology for challenging conditions
KASKA is equipped with the best professional pile-driving machines from GAYK, which allow work with piles up to 4,5 m long, ground drilling, rock drilling and ground screws tightening. The machines are self propelled and tracked (into terrain).
GAYK machines are maintained to the highest standards, providing maximum reliability. They can drive piles into the ground with precision in a matter of minutes. This speeds up installation, reduces costs, and saves time. It is a suitable choice for large projects.





